Estimates

What is a day rate vs a project rate?

Day Rate Estimates Pricing

An estimate mixing a per-day task line and a fixed-price fee line

A day rate charges a client a flat amount for each day you work on their job, while a project rate sets one fixed price for the entire job no matter how long it takes. Day rates bill your time; project rates bill your outcome.

Day rate: paid for your time

With a day rate, you quote a single number per working day (say, $600/day) and the total scales with how many days the job runs. It is a close cousin of the hourly rate, just bundled into bigger blocks, which is why it suits work where the scope is fuzzy or likely to shift: editing days, shoot days, on-site consulting, or a developer embedded with a team for a sprint.

  • Best when scope is unclear, the client may add work mid-stream, or you genuinely don’t know how long things will take.
  • Watch out for the ceiling problem: clients see the day count and may push you to rush. Pair it with a clear estimate of expected days so nobody is surprised.

Project rate: paid for the outcome

A project rate is one fixed fee for an agreed deliverable, “a 5-page website for $3,500,” regardless of whether it takes you three days or five. The client gets budget certainty and you get rewarded for efficiency: if you finish fast, you keep the upside. The risk flips onto you, though, so a project rate only works when the scope is genuinely nailed down.

  • Best when the deliverable is well-defined and you’ve done similar work before.
  • Watch out for scope creep. Spell out exactly what’s included, and treat extras as a separate line or a fresh estimate.

Tip: Unsure which way to go? Estimate the project rate by guessing your day rate times the days you expect, then add a buffer for revisions. If the buffer makes you nervous, bill by the day instead.

A real-world example

You’re a video editor quoting a brand film. As a day rate, you’d line up four edit days at $700 each, total $2,800, and the number moves if the client wants a fifth day of changes. As a project rate, you’d quote a flat $3,200 for “final delivered film, two rounds of revisions” and absorb the timing risk yourself. Same job, two very different conversations about money.

How Fee-Lion handles it

Both models live inside one estimate, so you can mix and match on the same job. Open Estimates in the left sidebar and start a new one:

  1. For a day rate (or hourly), add a Task line. Tasks are hours × rate, so enter your day rate as the rate and the number of days as the quantity, or convert to hours, whichever reads cleaner for the client.
  2. For a project rate, add a Fee or Unit line. These are quantity × rate, so set quantity to 1 and the rate to your fixed price for a clean, single-figure fee.
  3. Layer on any discounts or surcharges, then set your tax and deposit % at the bottom.
  4. Send it. The client reviews and approves in a no-login portal, and once they do you convert it to an invoice in one click.

To stop retyping your numbers, save your usual day rate and tax under Settings → Preferences, where your payment terms, tax, and deposit defaults live. If you bill by the day a lot, time tracking can feed real hours straight onto an invoice line so your billed days match what actually happened.

What’s next

Join the discussion

Members join the discussion

Comments are for Fee-Lion users. Enter your email and we'll send a one-time link to sign in — no password.

Not a customer yet? Start free — then join the conversation.